| Recently a complete J-lay system was supplied to Balder of Heerme (see picture). The supply comprises the design, manufacturing and testing. |
|
![]() |
|
| In 1999 a complete J-lay system was supplied to Saipem (see picture). The scope of supply comprises the design, manufacturing and testing of: |
|
|
|
![]() |
| The tower consists of two major parts, the lower and upper tower. | |
| The complete system can be installed and removed
by the vessels own cranes. |
![]() |














